BOCW Compliance in India After the Labour Codes (2026)

LexComply BlogLexComply Blog12 min read

TL;DR

  • Both 1996 BOCW Acts were repealed on 21 November 2025: the OSH Code now carries site duties and the Code on Social Security carries the cess and worker welfare.
  • An establishment doing building or other construction work with ten or more workers registers under section 3 of the OSH Code (Form-I in the Central sphere).
  • Form-VI is due within 30 days of work starting or stopping.
  • The cess is 1% of the cost of construction under S.O. 2322(E) of 8 May 2026, self-assessed and paid in advance; State rules can set payment timing and appeals, as Uttar Pradesh's 2026 rules do.
  • Employers and contractors must register eligible building workers with the State Welfare Board within 30 days of eligibility.

Quick Answer: BOCW compliance in India now runs under two labour codes, which repealed both 1996 BOCW Acts on 21 November 2025. The OSH Code governs sites with ten or more workers, which register under section 3. The Social Security Code levies a 1% cess on construction cost under S.O. 2322(E) and requires eligible workers to be registered within 30 days.

Most guidance on building and other construction workers (BOCW) still describes two statutes that no longer exist. The Occupational Safety, Health and Working Conditions Code, 2020 (OSH Code) now carries the site duties. The Code on Social Security, 2020 (SS Code) carries the cess and worker welfare.

BOCW obligations at a glance

Obligation Where it sits now Key figure or deadline
Coverage OSH Code s.2(1)(v)(ii) Ten or more workers
Registration OSH Code s.3; Central Rule 3 Form-I, within 60 days of the Code applying
Commencement and cessation notice OSH Code s.5; Central Rule 4 Form-VI within 30 days of starting or stopping
Cess SS Code s.100(1); S.O. 2322(E) 1% of the cost of construction
Cess return on completion SS (Central) Rules, Rule 41 Form-XVIII within 60 days of completion
Worker registration with the Board SS Code s.106; Rule 45(1) Within 30 days of eligibility
Annual return OSH (Central) Rules, Rule 74 Form-XVII by the last day of February

Form numbers are those of the Central Rules; a State's own rules may use different forms.

Does the BOCW Act Still Apply After the Labour Codes?

No. The Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Act, 1996 is repealed by section 143(1)(m) of the OSH Code. S.O. 5321(E) brought the whole Code into force on 21 November 2025, with no carve-outs.

The Building and Other Construction Workers Welfare Cess Act, 1996 is repealed by item 8 of section 164(1) of the SS Code, from the same date. That item was commenced by S.O. 5319(E). Its corrigendum, S.O. 5936(E) of 19 December 2025, did not change the cess item.

What Happens to Old Registrations and Rules?

They continue, within limits. Section 143(3) of the OSH Code deems anything done under the repealed Acts to be done under the corresponding provisions of the Code, to the extent it is not contrary to the Code. Section 3(8) deems an existing registration valid, on condition that the holder provides its details to the registering officer.

Which Construction Work Must Comply?

Building or other construction work in which ten or more workers are employed is an "establishment" under section 2(1)(v)(ii) of the OSH Code, 2020. The OSH test has no twelve-month look-back. The Centre may notify hazardous activities to which the threshold does not apply.

Section 2(1)(h) excludes work connected with a factory or mine. It also excludes work on one's own residence costing up to ₹50 lakh.

Do the Two Codes Define Construction Work the Same Way?

No. The SS Code definition, which drives the cess and Board registration, also excludes work employing fewer than ten workers in the preceding twelve months. The look-back exists only in the SS Code, so a site can fall inside one test and outside the other.

How Does a Construction Establishment Register?

Electronically, within 60 days of the Code applying to it, under section 3(1). In the Central sphere the application is Form-I on the Shram Suvidha Portal. The certificate issues in Form-III within seven days of a complete application, or is deemed auto-generated.

Changes are reported within 30 days. Closure is notified within 30 days with a dues certificate in Form-II. Section 3(7) bars an unregistered establishment from employing anyone.

When Is the Commencement Notice Due?

Within 30 days of work starting or stopping, under section 5 and Central Rule 4. The notice is Form-VI, sent to the registering officer and the Inspector-cum-Facilitator. A cessation notice needs a certificate that all dues are paid and that the premises are clear of hazardous chemicals.

How Is BOCW Cess Calculated and Paid?

At 1% of the cost of construction incurred by the employer. Section 100(1) of the SS Code allows a rate not less than 1% and not exceeding 2%. S.O. 2322(E) of 8 May 2026 fixed it at 1%, superseding the 1996 notification. Cost of construction excludes land and employee's compensation.

The procedure sits in Rules 41 to 47 of the Social Security (Central) Rules, 2026, which superseded the 1998 Cess Rules.

Step Form Timing
Notice to the assessing officer Form-XV Within 60 days of commencement
Advance payment on self-assessment Form-XVI At approval or before work starts
Stoppage or reduction, and refund claims Form-XVII Within 60 days of a stoppage or reduction
Completion return Form-XVIII Within 60 days of each completed project
Appeal against assessment Form-XIX Within 90 days

How Is the Self-Assessment Done?

A chartered engineer certifies it, valued on PWD or CPWD schedule rates or the project's RERA filings. Where a plan needs local-authority approval, proof of online cess payment goes with the application, and on that route a project lasting more than one year may pay one year's cess upfront.

What If the Cess Is Paid Late?

Interest runs at 1% per month or part of a month, under section 101 of the SS Code and Rule 42(2). Section 104 of the SS Code allows a penalty not exceeding the amount of cess, after a hearing. Unpaid cess is recoverable as arrears of land revenue under Rule 47.

Who Registers Construction Workers With the Welfare Board?

The employer or contractor, not the worker. Rule 45(1) requires it to register every building worker on its muster roll aged 18 to 60 with 90 days' work in the preceding twelve months. Registration is due within 30 days of eligibility, seeded with Aadhaar and a UAN or another unique number.

For a worker moving between States, the employer updates the destination State's Board within 30 days of the worker joining the muster roll. State Boards continue to administer registration and benefits.

Which Safety, Welfare and Record Duties Apply on Site?

The OSH Code sets duties for the employer, the architect and the site. Wages and minimum wages on site fall under the Code on Wages, 2019, with the contractor treated as an employer.

Duty Provision
Safety of the premises Section 6(1)(h) and 6(2)
Architect, project engineer and designer duties Section 9
Notice of an accident causing death or 48 hours' disablement Section 10
Safety officers at 250 or more workers Section 22(2)(c)
Canteen at 100 or more workers Section 24(1)(v)
Free temporary living accommodation where the site is remote from workers' homes Section 24(2)(v); Central Rule 62
Annual medical examination for workers aged 40 and above Central Rule 5

The examination rule is set out in the guide to the OSH Code annual health check-up.

Which Registers and Returns Does a Site Keep?

In the Central sphere, Forms XIII, XIV, XV, XIX and XX record employees, attendance, wages, accidents and leave. Records are kept for five years. The annual return in Form-XVII, with Form-XVIII, is due by the last day of February. The full set is in the employer registers and returns matrix.

What Are the Penalties for Non-Compliance?

They are graded by the type of breach.

Breach OSH Code provision Penalty
Any contravention not otherwise provided Section 94 ₹2 lakh to ₹3 lakh, plus up to ₹2,000 a day if continued after conviction
Registers and records Section 96 ₹50,000 to ₹1 lakh
Return, notice or register not furnished in time Section 99 ₹1 lakh to ₹2 lakh
Contravention causing death Section 103 Up to two years, or a fine of not less than ₹5 lakh, or both
Work continued in breach of a prohibition order Section 104 Up to two years and a fine up to ₹5 lakh

The Jan Vishwas (Amendment of Provisions) Act, 2026 does not amend either Code.

Which BOCW Act Sections Moved Where?

Each duty under the two 1996 Acts now has a home in a Code, often with a changed figure.

Old provision New home What changed
BOCW Act s.7: establishment registers within 60 days OSH Code s.3(1); s.3(8) deems existing registrations Electronic filing; no one may be employed without it (s.3(7))
BOCW Act s.12: eligible worker applies to the Board SS Code s.106; Central Rule 45 Now an employer and contractor duty
BOCW Act s.18: State Welfare Boards SS Code s.7; Fund in s.108 Boards now sit under the SS Code
BOCW Act s.40: safety and health rules OSH Code ss.6, 18, 23 and 24; rule powers in ss.133 and 134 Split between Central standards and appropriate-Government rules
BOCW Act s.46: notice at least 30 days before work starts OSH Code s.5; Central Rule 4 Form-VI within 30 days of work starting or stopping
BOCW Act s.47: penalty for breaching safety rules OSH Code ss.94 and 103 ₹2 lakh to ₹3 lakh in general
BOCW Act ss.37 and 38: canteen at 250 workers; safety committee at 500 OSH Code s.24(1)(v) canteen at 100; s.22(2)(c) safety officers at 250 Lower thresholds
Cess Act s.3: cess of 1% to 2% SS Code s.100; 1% under S.O. 2322(E) Cost excludes land and compensation
Cess Act s.8: interest at 2% a month SS Code s.101; Central Rule 42(2) Interest halved to 1% a month

Do State Rules Change These Obligations?

Often, yes. Construction is mostly a State-sphere matter. The Central forms for registration, the commencement notice, medical examinations and accident notices bind only establishments for which the Centre is the appropriate Government. Section 134 lets the Centre make some rules for all establishments, including on the registration certificate and on health and welfare facilities.

Are State OSH Rules in Force Yet?

Yes, in Uttar Pradesh. Uttar Pradesh notified final OSH and Social Security Rules on 27 August 2026, replacing its 2009 BOCW Rules; other States are notifying theirs one by one. Until a State does, section 143(3) keeps its old BOCW rules running to the extent they are not contrary to the Code.

The Centre sets the cess rate, the self-assessment basis and the worker-registration duty; a State's own rules can set payment timing and the appeal procedure, as Uttar Pradesh's 2026 rules do. A State-by-State view of the other labour obligations is in the multi-state labour law compliance checklist.

How Can a Compliance Team Track BOCW Duties Across Sites?

Hold each site as its own establishment, with a registration, a cess file and an owner. Contractors on the site carry separate licence duties, covered in the guide to a contract labour management system. For help with the licences themselves, see the labour licence consultant service.

LexComply's compliance management platform covers HR, labour and employment law and lists infrastructure and real estate among its industries. It tracks obligations against each entity and location; the filings themselves remain with the employer.

Common Mistakes to Avoid

  • Citing the BOCW Act, 1996 as current law. It was repealed on 21 November 2025 by section 143(1)(m) of the OSH Code, commenced by S.O. 5321(E).
  • Treating the commencement notice as a one-off. Central Rule 4 requires Form-VI within 30 days of work starting and again within 30 days of it stopping, with an all-dues certificate.
  • Applying a twelve-month look-back to OSH coverage. The OSH Code says ten or more workers with no look-back. The look-back exists only in the SS Code definition.
  • Treating the cess penalty as a fixed sum. Section 104 of the SS Code sets a maximum, not exceeding the amount of cess, and interest is 1% per month under Rule 42(2).
  • Leaving worker registration to the workers. Rule 45(1) makes it an employer and contractor duty, within 30 days of eligibility.
  • Citing section 143(2) as the savings clause. Section 143(2) covers officers; the savings clause is section 143(3).

This article is general information on BOCW compliance under the OSH Code, 2020 and the Code on Social Security, 2020, current as at the date shown above. It is not legal advice, and State rules may change forms and timelines, so confirm the position for each site.

Frequently Asked Questions

Is BOCW registration still required under the OSH Code?
Yes. A construction establishment with ten or more workers registers under section 3 of the OSH Code, in Form-I in the Central sphere. A registration under the old Act is deemed valid under section 3(8) only if the holder gives its details to the registering officer.
How is labour cess calculated on a construction project?
At 1% of the cost of construction incurred by the employer, excluding land and employee's compensation. The amount is self-assessed, certified by a chartered engineer and valued on PWD or CPWD schedule rates or RERA filings, then paid in advance.
Does the cess apply to building one's own house?
Not where the house is for one's own residence and costs up to ₹50 lakh, which is excluded from building or other construction work. The SS Code definition, which drives the cess, also excludes work employing fewer than ten workers in the preceding twelve months.
Who deducts the cess on a government project?
The government department or public sector undertaking deducts it from the contractor's bills at source. Rule 41 of the Social Security (Central) Rules, 2026 requires the amount to be deposited within 30 days of deduction.
When does the assessing officer scrutinise a cess self-assessment?
Only where the self-assessed cess exceeds ₹10 lakh, under Rule 41. If no assessment order issues within 180 days, the self-assessment is deemed final. Under the Central Rules, an appeal against an order goes in Form-XIX within 90 days.
Are the State construction welfare boards still operating?
Yes. State Building and Other Construction Workers Welfare Boards continue to administer worker registration and benefits. The 2026 Central Rules rely on their portals for worker registration, on a half-yearly cess report to the State and on each Board's annual report.